4 years after our move in we already have to push the walls!
Work began in December 2022 and we should take possession of this new space in the summer of 2023.
Our factory will now have a surface area of 1100 m2. As for the main building, we have selected local craftsmen, renewable materials (wooden frame, etc.) and we will cover the roof with photovoltaic panels.